Toyota Motoring Manufacturing

1) How does the andon procedure work and what are its fundamental aspects? How much does it cost to stop the line? What are the benefits of stopping the line? The andon procedure is adopted by Toyota Motor Manufacturing to ensure quality of their products. It involves the pulling of the andon cord whenever production at a work station is unable to be completed within the cycle time, or whenever any problem is faced. Pulling the andon cord will alert the team leader to the station. If the problem can be corrected immediately, assembly is resumed by pulling the andon cord again.

However, if the team leader is unable to solve the problem, the line is stopped. With this process, Toyota is able to manufacture quality products and prevent defective products from being transferred on to the next station. This is in line with Toyota’s principle of jidoka where problems are instantly detected and production is stopped whenever a problem is detected. However, stopping the line will reduce the flow time of the car assembly and flow rate of the production. As more time is required to produce the cars, worker overtime costs will be incurred.

According to the case, line stoppages caused a shortfall of 45 cars per shift. These cars could have been sold in the market instead. Thus, line stoppages caused lost revenue (opportunity cost) for these 45 cars. In analyzing the costs for stopping the line, we assume that hourly wage per team leader is set at a 6. 5% premium. We assume 769 team members are spread equally between the two shifts. We assume that each worker causes an average of 1 line stop per shift. The number of shortfalls in a shift is based on that in April 1992 i. e. 45 cars.

The breakdown of costs incurred to stop the line is as follows: Hourly Wage per Team MemberHourly Wage per Team Leader (6. 5% premium)Overwage rate per Team MemberOvertime Wage Rate per Team Leader 1718. 10525. 527. 1575 Number of Shortfalls per Shift45 Number of Shifts2 Total Team Members769 No. of Team Members per Shift (769/2)384 Number of Team Leaders per Shift102 Number of Stops per Worker per Shift1 Number of Stops per Shift384 Overtime per Car (57s/3600)hrs0. 0158333 Total Overtime Cost per Shift ($)8950. 4713 Overtime Cost per Stop ($)23. 308519 Lost Revenue per Stop (0. 17 x 18,500 x 45)/384368. 5469 Tota Cost Incurred per Stop ($)391. 86 Benefits of stopping the line is to reduce wastage as defects are detected early and problems can be solved earlier before the defect is passed on to the next station. 2) What are the underlying causes of the problems facing Doug Friesen? The main problem faced is a decrease in run ratio, which measured the numbers of cars actually assembled in proportion to the number of cars that could have been assembled with no line stoppages, from 95% to 85%. This drop also led to a shortfall of 45 cars per shift, which had to be made up with overtime.

The underlying causes are as follow: •The combination of seats, which resulted from by the variety of Toyota Camry, has increased the probability of defects or human error. •Problems are not solved at the point where the defect is detected and the defective cars remained in the assembly line until they are moved to the Code 1 clinic area for further inspection and quality control. Solving problems at the end of the assembly line could be more difficult or require more time than at the spot where the problem was first detected.

This is because the car at the end of the assembly line has already been completely assembled thus, making amendments to specific components could be more challenging. •There is a long waiting time for the delivery of replacement seats from KFS to TMM. This led to an increase in inventory in the overflow parking area where the cars waited for KFS’ special delivery. 3) How, if at all, does the current routine for handling defective seats deviate from the principles of the Toyota Production System (TPS)? The current routine deviates from the TPS principles of Jidoka and Just-in-Time (JIT) production.

JIT Principle TPSCurrent Routine (deviation) Produces only what was needed, how much was needed, and only when it was needed. Any deviation from true production needs was condemned as waste. Defective cars remain in inventory and some have to wait for replacement seats to be delivered. Cars are not produced at maximum capacity. Thus, consumer demand is not met on time. Jidoka Principle TPSCurrent Routine (deviation) Make any production problems instantly self-evident and stop producing whenever the problem was detected.

Insisted on building in quality in the production process and condemned any deviation from value-addition as waste. Does not follow the jidoka principle – instead of stopping production and waiting for the new seat to arrive then fixing the seat before production restarts, Toyota continues with production and only fixes the seats after production ends 4) As Doug Friesen, what would you do to address the seat problem? Where would you focus your attention and solution efforts? What options exist? What would you recommend? Why? There are several solutions to address the seat problem in the manufacturing process.

These solutions are non-exclusive and could be implemented together. Solution 1: Decrease the error caused by variability in car seat styles. This can be done by investing in training staff so that they will be proficient in handling the variety of seat styles for respective cars and reduce the defect rate caused by human error. Another way is to assemble the cars in batches based on its respective seat styles as this method of production decreases the chance of human error as well since production will be more uniform. However, batching violates Toyota’s ‘Heijunka’ principle.

Solution 2: Toyota could also consider the option of repairing the damaged seat immediately rather than allowing it to through the entire process first and congregating at the end of the line; in other words, to put the practice of jidoka into play. All staff involved in the production line will then have to be more critical in ensuring the best quality of the seats, and stop the production line once a defect is realized. However, repair staff would need to be well equipped to handle the situation. Furthermore, this solution requires the production line to stop, thus incurring costs.

Solution 3: Switch to another seat supplier or source for additional suppliers to ease the current load on KFS since the current supplier delivers poor quality of seats which causes the problem in the manufacturing process. However, having more than 1 supplier may result in differences across the finished goods as it is difficult for two suppliers to provide identical seats. Solution 4: Stock safety inventory to use it as a buffer for the defective seats so as to decrease the wait time required to deliver replacement seats.

However, having excess seat inventory will incur inventory cost. It is also against the JIT principal which hallmarks Toyota. Solution 5: Seats can be redesign such as changing plastic hooks back to metal to reduce the probability of one of the problems for defective seats, which is a broken hook. The focus of the solution should be aimed at improving the internal process problem which is decreasing the human error caused by variability of car seat style and also improving external process problem which is the quality of the car seats supplier.

As show in Exhibit 8, the main cause of defective seats comes from the poor quality of seats delivered by the supplier. Therefore it is vital that we would firstly have to improve the delivered seats and Toyota can do so by bringing up this issue to the management at KFS. Toyota must demand for better quality products and if the problem continues due to poor quality of seats, Toyota should then source for additional suppliers to cover up for the lack of quality sets supplied by KFS.

Once the external problem has been handled, Toyota must look at ways to improve the capabilities of its production line staff. By training them to handle the various seat styles for respective cars, it increases the skill level of the workers and hence decreases the probability of making an error. However, Toyota will incur training cost but these costs will reflect savings in the long run if its staff would make less errors hence improving the run ratio of the production line.

Calculate the price
Make an order in advance and get the best price
Pages (550 words)
$0.00
*Price with a welcome 15% discount applied.
Pro tip: If you want to save more money and pay the lowest price, you need to set a more extended deadline.
We know how difficult it is to be a student these days. That's why our prices are one of the most affordable on the market, and there are no hidden fees.

Instead, we offer bonuses, discounts, and free services to make your experience outstanding.
How it works
Receive a 100% original paper that will pass Turnitin from a top essay writing service
step 1
Upload your instructions
Fill out the order form and provide paper details. You can even attach screenshots or add additional instructions later. If something is not clear or missing, the writer will contact you for clarification.
Pro service tips
How to get the most out of your experience with MyStudyWriters
One writer throughout the entire course
If you like the writer, you can hire them again. Just copy & paste their ID on the order form ("Preferred Writer's ID" field). This way, your vocabulary will be uniform, and the writer will be aware of your needs.
The same paper from different writers
You can order essay or any other work from two different writers to choose the best one or give another version to a friend. This can be done through the add-on "Same paper from another writer."
Copy of sources used by the writer
Our college essay writers work with ScienceDirect and other databases. They can send you articles or materials used in PDF or through screenshots. Just tick the "Copy of sources" field on the order form.
Testimonials
See why 20k+ students have chosen us as their sole writing assistance provider
Check out the latest reviews and opinions submitted by real customers worldwide and make an informed decision.
History
Looks great and appreciate the help.
Customer 452675, April 26th, 2021
Business and administrative studies
Excellent work ,always done early
Customer 452773, February 21st, 2023
10th grade English
very good
Customer 452773, March 26th, 2023
Business and administrative studies
Thank you for your hard work and effort. Made a 96 out of 125 points Lacked information from the rubic
Customer 452773, October 27th, 2023
Business and administrative studies
always perfect work and always completed early
Customer 452773, February 21st, 2023
fin571
EXCELLEN T
Customer 452773, March 21st, 2024
Social Work and Human Services
Great work I would love to continue working with this writer thought out the 11 week course.
Customer 452667, May 30th, 2021
Leadership Studies
excellent job
Customer 452773, July 28th, 2023
Human Resources Management (HRM)
excellent
Customer 452773, June 25th, 2023
BUSINESS LAW
excellent job made a 93
Customer 452773, March 22nd, 2023
Business Studies
Thank you very much for a good job done and a quick turn around time.
Customer 452615, March 31st, 2021
ACC/543: Managerial Accounting & Legal Aspects Of Business
EXCELLENT JOB
Customer 452773, January 10th, 2024
11,595
Customer reviews in total
96%
Current satisfaction rate
3 pages
Average paper length
37%
Customers referred by a friend
OUR GIFT TO YOU
15% OFF your first order
Use a coupon FIRST15 and enjoy expert help with any task at the most affordable price.
Claim my 15% OFF Order in Chat
Close

Sometimes it is hard to do all the work on your own

Let us help you get a good grade on your paper. Get professional help and free up your time for more important courses. Let us handle your;

  • Dissertations and Thesis
  • Essays
  • All Assignments

  • Research papers
  • Terms Papers
  • Online Classes
Live ChatWhatsApp