Essay On Supply Chain

Operation Granby was the first of recent major operation to highlight inadequacies in the defence supply chain, most of which have been left unaddressed (HMSO, 1991). More recently Operation TELIC has highlighted the need for the MOD to implement an efficient asset tracking system that would work in peacetime and on operations.

Having served in Iraq with 2 Close Support Regiment (RLC) during the Gulf War it became obvious that many items of critical stock went undelivered simply because it couldn’t be traced, yet much of it had already been delivered to the theatre of operations as was evident by the lines of unopened containers at the port of disembarkation, all without inventories; this is clearly an unacceptable situation and one which caused a lack of confidence in front line Commands.

Asset tracking is likely to be a key component of Network Enabled Capability (NEC) and it is likely that, in the near future, one organisation will be responsible for the level two routing, planning and control of personnel and cargo across all lines of communication (Booton, 2006). Level three, in terms of defence, may include risk associated with changing political direction and policies as well as internal MOD policies and doctrine. The Joint Supply Chain (JSC) blueprint concept is underpinned by effective policy, doctrine and training.

Clearly supplier relationships also fall into this category and are often difficult to manage within the UK defence environment. Red tape and being ‘seen to be fair’ have precluded the building of some relationships although it is hoped that the change in Defence Industrial Policy will help to break some of these barriers. Level four risks may well include natural disasters that affect public and private companies alike but for defence it also includes the possibility of conflict.

Most risks at this level could be identified using a PESTEL analysis; this is a technique for understanding external influences on businesses or processes: Political, Economic, Social, Technological, Environmental and Legal (Johnson et al, 2005). In defence terms level four risks could well include the results of direct enemy action. When the container ship, Atlantic Conveyer, was sunk on 25 May 1982 during the Falklands conflict the majority of supplies (including helicopters) were lost. This was a huge blow to the logistics support for this operation and a lesson in resilience that should have been learned.

Can Six Sigma Help ? Whilst it is recognised that Six Sigma provides tools for continuous improvement and can help make processes more robust (Peck, 2003), there is little evidence to suggest that it can make them more resilient although it could be argued that if processes are continually refined then capability/capacity is created. Increased capability/capacity can be used in two ways; firstly it could be maintained to increase resilience or secondly it could be removed to introduce further cost savings. The defence supply problem is particularly difficult to solve.

The majority of time the supply chain operates in a relatively benign environment (peacetime) and offers the opportunity to apply six sigma and lean techniques to improve processes and create savings. Whilst on operations, however, there is a need for a much more agile supply system and the need for resilience increases. In businesses where six sigma has been hailed as a success it has undoubtedly required a cultural change and substantial changes in the organisations structure and infrastructure (Coronado, Antony, 2002).

Six sigma also needs businesses to be long term focused as the benefits are not realised in the short term (Dale, 2000). Initially, the implementation of six sigma can be resource intensive and costly; this is an area where, due to the annularity of its budget, the MOD had traditionally been perceived to lack commitment. Analysis of the Defence Supply Chain shows that the three services still operate differently, yet need to use the same supply chain on operations.

Different sites within the MOD logistics organisation also operate with differing procedures (Chapell, Peck, 2005) which can clearly be rectified by adopting six sigma methodologies. The lack of available data, particularly with regards low usage but operational critical spares, is seen as a hurdle for six sigma implementation but one that is not insuperable (Chapell, Peck, 2005) and the benefits that could be achieved by adhering to specific process models is enormous. Perhaps the MOD can learn from its NATO allies.

For instance Brigadier Schulz speaks about a shift of paradigm within the Bundeswehr: “In old-style materiel management every business economist was proud to have all necessary spare parts, to last him for up to 20 years if needed. Spares were possibly stockpiled for 20 years without anybody ever requiring them. What we are involved with now is process orientation, ensuring that the necessary information as well as the parts needed for a specific process, are available at the right time and in the right quantity”.

The Defence Logistics Transformation Programme (DLTP) is an initiative already being undertaken by the MOD whose aim is to provide a single coherent programme of work incorporating all logistic transformation activities across defence – deployed forward on operations, within the defence industry, during the early stages of equipment acquisition, or when planning for disposal. It will be utilising process control methodologies and lean techniques to improve repair loop times and availability of spares; this, in turn, is likely to increase the supply chain resilience.

Conclusion It is evident that, should six sigma be successfully implemented into the defence supply chain then it has much to offer and could, almost certainly, make the supply chain more resilient. For the MOD this process is a lengthy one and one in which few significant monetary savings can be made in the short term. To succeed it would have to be driven with commitment and enthusiasm at the highest level.

It would require training, communication, changes in organisational structure and a cultural change; it is a difficult, time consuming path to follow but if the MOD wishes to reap the rewards it must recognise these hurdles and strive to overcome them. The DLTP is a step in the right direction. There is currently a danger that the peacetime savings that can be realised using lean techniques will be afforded priority and this short term view will undoubtedly make the defence supply chain less resilient and more susceptible to failure on operations; an outcome which is unacceptable.

There is a fine balance that can be achieved between agile and lean and providing ‘value for money’ to the taxpayer will always remain a key factor, particularly with the constant public and media scrutiny that public organisations work under. One study has suggested that the increased visibility of some processes brought about by the use of a process control methodology has aided supplier performance evaluation and control (Laframboise, Reyes, 2005).

There is much evidence to suggest that methodologies such as six sigma, when implemented correctly, do reduce risk and certainly give greater control over processes. This increased control and reduction in risk will increase the resilience of the supply chain making it well placed to overcome disruptive events.

However, supply chain resilience can not be achieved by process control methods alone. Whilst it may go someway to helping overcome disruptive events it should be used in conjunction with other tools and techniques, such as the building of sound supply relationships. A good toolset can be found in the Department for Transport sponsored document, “Creating Resilient Supply Chains: A Practical Guide”.

References:

Bartlett A, (1999), GE’s two decade transformation: Jack Welch’s Leadership, Harvard Business Review, 17 August 1999. Booton, A. (2006), Joint Supply Chain Blueprint – An Introduction, The Blueprint Booklet, 31 January 2006 Available from: http://defenceintranet. diiweb. r. mil. uk/NR/rdonlyres/A941358F-37E9-4023-AB06-136181A7DF1C/0/Blueprtdoc. pdf [Accessed 27 February 2006]

Calculate the price
Make an order in advance and get the best price
Pages (550 words)
$0.00
*Price with a welcome 15% discount applied.
Pro tip: If you want to save more money and pay the lowest price, you need to set a more extended deadline.
We know how difficult it is to be a student these days. That's why our prices are one of the most affordable on the market, and there are no hidden fees.

Instead, we offer bonuses, discounts, and free services to make your experience outstanding.
How it works
Receive a 100% original paper that will pass Turnitin from a top essay writing service
step 1
Upload your instructions
Fill out the order form and provide paper details. You can even attach screenshots or add additional instructions later. If something is not clear or missing, the writer will contact you for clarification.
Pro service tips
How to get the most out of your experience with MyStudyWriters
One writer throughout the entire course
If you like the writer, you can hire them again. Just copy & paste their ID on the order form ("Preferred Writer's ID" field). This way, your vocabulary will be uniform, and the writer will be aware of your needs.
The same paper from different writers
You can order essay or any other work from two different writers to choose the best one or give another version to a friend. This can be done through the add-on "Same paper from another writer."
Copy of sources used by the writer
Our college essay writers work with ScienceDirect and other databases. They can send you articles or materials used in PDF or through screenshots. Just tick the "Copy of sources" field on the order form.
Testimonials
See why 20k+ students have chosen us as their sole writing assistance provider
Check out the latest reviews and opinions submitted by real customers worldwide and make an informed decision.
Leadership Studies
excellent job
Customer 452773, August 3rd, 2023
Philosophy
Thank you
Customer 452811, February 17th, 2024
fin571
EXCELLEN T
Customer 452773, March 21st, 2024
Data 564
excellent work
Customer 452773, April 11th, 2024
Business and administrative studies
excellent job thank you Your Score 166.25/ 175- A 1. Current Culture 15% of total grade 18.37 Criterion "1. Current Culture" has textual feedback Criterion Feedback I see interesting points, though, in general they are not about the culture.
Customer 452773, June 4th, 2023
Business and administrative studies
excellent work
Customer 452773, March 9th, 2023
Nursing
I just need some minor alterations. Thanks.
Customer 452547, February 10th, 2021
Business and administrative studies
great job as always
Customer 452773, February 26th, 2023
Sociology
THANK YOUUUUU
Customer 452591, March 18th, 2021
Psychology
Thank you!
Customer 452545, February 6th, 2021
Business and administrative studies
Thank you for your hard work and help
Customer 452773, February 21st, 2023
Leadership Studies
excellent job
Customer 452773, July 28th, 2023
11,595
Customer reviews in total
96%
Current satisfaction rate
3 pages
Average paper length
37%
Customers referred by a friend
OUR GIFT TO YOU
15% OFF your first order
Use a coupon FIRST15 and enjoy expert help with any task at the most affordable price.
Claim my 15% OFF Order in Chat
Close

Sometimes it is hard to do all the work on your own

Let us help you get a good grade on your paper. Get professional help and free up your time for more important courses. Let us handle your;

  • Dissertations and Thesis
  • Essays
  • All Assignments

  • Research papers
  • Terms Papers
  • Online Classes
Live ChatWhatsApp